This article lists events related to rail transport that are currently scheduled to occur in 2031. Please be aware that the actual dates on which these events occur may differ substantially from what is shown here.
Events
Unknown date
- – L5 Parramatta and Olympic Park Line of the Sydney Light Rail opens between Parramatta Sqaure and Carter Street.
- – Line 4 of the Dhaka Metro opens between Kamalapur and Madanpur.
- – Green Line of the Calgary CTrain opens between 16 Avenue N and Shepard.
- – Blue Line of the Montreal Metro extends to Anjou from Saint-Michel.
- – Line 2 of the Toronto Subway extends to Sheppard / McCowan from Kipling.
- – Line 3 of the Toronto Subway opens between Exhibition and Science Centre.
- – Line 5 of the Toronto Subway extends to Renforth from Mount Dennis.
- – Line D of the Prague Metro opens between Pankrác and Písnice.
- – Line 15 of the Paris Metro extends to Pont de Sèvres from Saint-Cloud, making it a loop line.
- – West Helsinki Light Rail of the Helsinki Tramway Network opens between Munkkiniemi and Kannelmäki
- – Helsinki–Turku High Speed Railway opens between Helsinki and Turku.
- – Delhi–Varanasi High Speed Railway opens between Delhi and Varanasi.
- – Red Line of the Namma Metro opens between Hebbala and Sarjapura.
- – Line 1 of the Bali MRT opens between Ngurah Rai Airport and Cemagi.
- – Line 1 of the Bali MRT extends to Nusa Dua from Ngurah Rai Airport.
- – East–West Line of the Jakarta MRT opens between Tomang and Medan Satria.
- – Green Line of the Dublin Tramway Network extends to Charlestown Shopping Centre from Broombridge.
- – Line 5 of the Milan Metro extends to Monza from Bignami.
- – Naniwasuji Line of the Nankai Electric Railway opens between Ōsaka and Shin-Imamiya.
- – Penang Mutiara Line opens between Penang Sentral and Silicon Island.
- – Lisburn-Antrim Line of the Northern Ireland Railways reopens between Lisburn and Antrim.
- – Line 1 of the Manila LRT extends to Niog from Dr. Santos.
- – Cluj Napoca Metro opens between Tara Motilor and Munchii.
- – Line 3 of the Seoul Subway extends to Pungyang from Saemteo Park.
- – Line 9 of the Seoul Subway extends to Namyangju from VHS Medical Center.
- – Ui LRT of the Seoul Subway branches off from Solbat Park and extend to Banghak.
- – M3 of the Lausanne Metro opens between Lausanne-Chauderon and Ouchy.
- – Wanda–Shulin Line of the Taipei Metro extends to Huilong from Juguang.
- – Blue Line of the Tainan MRT opens between Rende Carrefour and Rende District.
- – Green Line of the Taoyuan Metro branches off to Hengshan from Changxing.
- – East San Fernando Valley Light Rail of the Los Angeles Metro opens between Van Nuys/San Fernando and Van Nuys/MOL.
- – Honolulu Skyline extends to Kaʻākaukukui from Kahauiki.
References
- ^ O'Sullivan, Matt (2022-11-09). "Second stage of Parramatta light rail line will not open until 2031". The Sydney Morning Herald. Retrieved 2025-01-02.
- ^ "ঢাকা ম্যাস ট্রানজিট কোম্পানি লিমিটেড (ডিএমটিসিএল)". dmtcl.gov.bd. Archived from the original on 2025-01-18. Retrieved 2025-01-28.
- ^ page, Content. "FAQs and resources". www.calgary.ca. Retrieved 2024-12-15.
- ^ "Blue line project". Société de transport de Montréal. Retrieved 2025-01-02.
- ^ Toronto, City of (2020-03-12). "Scarborough Subway Extension (Line 2 East Extension)". City of Toronto. Retrieved 2024-12-15.
- ^ "Ontario Line costs nearly double after awarding of latest contracts". Toronto Star. November 23, 2022. Archived from the original on November 24, 2022. Retrieved November 24, 2022.
- ^ "Eglinton Crosstown West Extension - FAQs". Metrolinx. Retrieved December 7, 2023.
- ^ Morning, Prague (2024-10-06). "Milestone Reached: Metro D Connects to Line C After Tunnel Breakthrough". Prague Morning. Retrieved 2024-12-21.
- ^ "Paris Metro Line 15 extension".
- ^ "West-Helsinki Light Rail". City of Helsinki. 2023-09-04. Retrieved 2025-01-24.
- ^ "Berner: New rail link between Helsinki and Turku set to be completed in 2031". Helsinki Times. 16 October 2018.
- ^ "Railway Budget 2021: Indian Railways to focus on new bullet train networks in coming years?". The Times of India. 23 January 2021.
- ^ Lalitha, S. (2024-06-27). "Phase-3A metro line from Sarjapur to Hebbal to be completed by 2031, says BMRCL". The New Indian Express. Retrieved 2025-01-07.
- ^ a b Expat, Indonesia (2024-07-26). "Bali Subway Project Commences the New Phase with Major Investment". Indonesia Expat. Retrieved 2025-01-21.
- ^ International2024-09-24T05:00:00+01:00, Metro Report. "Jakarta's east-west line breaks ground". Railway Gazette International. Retrieved 2025-01-02.
{{cite web}}
: CS1 maint: numeric names: authors list (link) - ^ "Finglas Luas: New tram line could service population of 60,000 by 2031". The Irish Times. Retrieved 2025-01-23.
- ^ "Metropolitane a Milano - Metropolitana Milanese". web.archive.org. 2011-10-26. Retrieved 2025-01-25.
- ^ "なにわ筋線「北梅田~JR難波・南海新今宮」の鉄道事業許可" [Railway business license for Naniwasuji Line "Kita Umeda-JR Namba / Nankai Shin-Imamiya"] (PDF). Japan Ministry of Land, Infrastructure, and Transport (MLIT) (in Japanese). 9 July 2019. Archived (PDF) from the original on 3 July 2021. Retrieved 7 February 2021.
- ^ "On track with Penang LRT construction from December". The Star. 2024-10-09. Retrieved 2025-01-02.
- ^ "Honeyford calls on Translink to reopen Knockmore Line in time for the Euros". NorthernIrelandWorld. 2024-03-06. Retrieved 2025-01-23.
- ^ "LRT-1 Cavite Extension to be completed by 2031". www.pna.gov.ph. Retrieved 2024-11-19.
- ^ "Cluj-Napoca breaks ground on new metro line amid major infrastructure unveilings - European Commission". urban-mobility-observatory.transport.ec.europa.eu. Retrieved 2024-10-31.
- ^ "Line 3 | Explore Seoul". seoul.exploremetro.com. Retrieved 2025-01-02.
- ^ Smith, Kevin (2025-01-07). "Green light for further extension of Seoul's Line 9". International Railway Journal. Retrieved 2025-01-07.
- ^ "우이신설역 연장 추진 확정, 솔밭공원~방학역 연결". 우먼컨슈머 (in Korean). 2019-02-21. Retrieved 2025-01-02.
- ^ "Le premier tronçon du métro m3 mis à l'enquête". 24 heures (in French). 2019-10-24. Retrieved 2025-01-02.
- ^ "Hitachi Receives an Order for All 147 Elevators and Escalators for the Second Phase of the Taipei MRT Wanda-Zhonghe-Shulin Line : November 28, 2024". www.hitachi.com. Retrieved 2025-01-07.
- ^ "MOTC approves Tainan MRT plans - Taipei Times". www.taipeitimes.com. 2024-03-23. Retrieved 2024-11-19.
- ^ "Taiwan News - Breaking News, Politics, Environment, Immigrants, Travel, and Health". www.taiwannews.com.tw. Retrieved 2024-12-15.
- ^ @numble (November 27, 2023). "October 2023 status report for LA Metro's East San Fernando Valley line. Contractor's initial schedule shows line opening at end of 2031, Metro is targeting summer 2031" (Tweet). Retrieved November 28, 2023 – via Twitter.
- ^ Wanek-Libman, Mischa (July 3, 2023). "Honolulu's Skyline opens for service". Mass Transit. Retrieved July 6, 2023.
- ^ "HART: Expect Honolulu's Full Rail Line To Be Done In 2031". Honolulu Civil Beat. March 10, 2021. Archived from the original on April 2, 2021. Retrieved September 20, 2021.
- ^ "City Center Section Utilities & Guideway Contract No. SC-HRT-1200149". Honolulu Authority for Rapid Transportation. Archived from the original on December 20, 2019. Retrieved December 20, 2019.