Chinese name | |||||||||||
---|---|---|---|---|---|---|---|---|---|---|---|
Traditional Chinese | 加蚋 | ||||||||||
Simplified Chinese | 加蚋 | ||||||||||
| |||||||||||
General information | |||||||||||
Location | Wanhua, Taipei Taiwan | ||||||||||
Operated by | Taipei Metro | ||||||||||
Line(s) | Wanda–Zhonghe–Shulin line (LG04) | ||||||||||
Construction | |||||||||||
Structure type | Underground | ||||||||||
Other information | |||||||||||
Station code | LG04 | ||||||||||
History | |||||||||||
Opening | December 2025 (expected) | ||||||||||
Services | |||||||||||
|
Kalah is an under construction metro station on the Wanda–Zhonghe–Shulin line located in Wanhua, Taipei, Taiwan. The station is scheduled to open at the end of 2025.
Station overview
The station will be a three-level, underground station with an island platform. The design theme of the station will be based on "Colorful MRT Rhythm - Fruit and Vegetable Rhapsody" which originates from the observation findings of the natural and cultural uniqueness of the station.
Station layout
1F | Street Level | Entrance/Exit |
B1 | Concourse | Lobby, information desk, automatic ticketing dispensing machines, one-way faregates (Under construction) Restrooms (Under construction) |
B3 | Platform 1 | Wanda-Zhonghe-Shulin line toward Chiang Kai-shek Memorial Hall (LG03 Xiaan) |
Island platform, Under Construction
| ||
Platform 2 | Wanda-Zhonghe-Shulin line toward Juguang (LG05 Yonghe Yongping Elementary School) |
Around the station
- Taipei Municipal Wanda Elementary School
- Taipei Municipal Dongyuan Elementary School
- Taipei First Fruit & Vegetable Wholesale Market
References
- ^ "臺北市政府捷運工程局". 5 July 2012.
- ^ "A Brief Introduction to the MRT Wanda-Zhonghe-Shulin Line Phase I" (PDF).