Line 1 | |
---|---|
1 | |
Overview | |
Status | Operational |
Locale | Shaoxing, Zhejiang Province, China |
Termini | |
Stations | 28 (main line) 3 (branch, 5 in 2025) |
Service | |
Type | Rapid transit |
System | Shaoxing Metro |
Operator(s) | Shaoxing Metro Corporation |
Rolling stock | PM139 ZBM02 |
History | |
Opened | 28 June 2021 |
Technical | |
Line length | 47.1 km (Main line, in operation) 7.3 km (Branch, 4.08 km opening in 2024) |
Character | Underground and elevated |
Operating speed | 80km/h |
Line 1 of Shaoxing Metro (Chinese: 绍兴轨道交通1号线; pinyin: Shàoxīng Guǐdào Jiāotōng Yīhào Xiàn) is a metro line in Shaoxing, Zhejiang Province, China.
Section
- Main line (Keqiao section)
The section from Guniangqiao to China Textile City opened on 28 June 2021. The section is 20.3 km (12.6 mi) in length with 10 stations. Elevated section from Yangxunqiao to Linhang Avenues.
Average speed through the trip: 38.3km/h
- Main line (remaining section)
The section from China Textile City to Fangquan is 26.8 km (16.7 mi) long and runs between China Textile City station in Keqiao District and Fangquan station in Yuecheng District, passing through the city center of Shaoxing with 18 stations. The section opened on 29 April 2022.
- Branch line (future Line 4)
The branch line will branch off at Huangjiu Town and head north for 7.3 km (4.5 mi) to Exhibition And Convention Center with 6 stations (5 new stations, Huangjiu Town station is already opened with the main line of Line 1). The initial section opened on 1 April 2024 and remaining section will open in 2025. The branch line will be part of Line 4 in future.
Opening timeline
Segment | Commencement | Length | Station(s) | Name |
---|---|---|---|---|
Guniangqiao — China Textile City | 28 June 2021 | 20.3 km (12.6 mi) | 10 | Main line (Keqiao section) |
China Textile City — Fangquan | 29 April 2022 | 26.8 km (16.7 mi) | 18 | Main line (remaining section) |
Huangjiu Town — Daqingsi | 1 April 2024 | 4.08 km (2.5 mi) | 3 | Branch line (initial section) |
Daqingsi — Exhibition And Convention Center | 2025 (Under Construction) | 3.22 km (2.0 mi) | 2 | Branch line (remaining section) |
Stations
Main line
Station Name | Connections | Distance km |
Location | ||
---|---|---|---|---|---|
English | Chinese | ||||
Guniangqiao | 姑娘桥 | 5 (Hangzhou Metro) | Xiaoshan, Hangzhou | ||
Yaqian | 衙前 | ||||
Yangxunqiao | 杨汛桥 | Keqiao, Shaoxing | |||
Qianmei | 前梅 | ||||
Qianqing | 钱清 | Shaoxing Urban | |||
Xisha Road | 西沙路 | ||||
Linhang Avenue | 临杭大道 | ||||
Jianshui Road | 鉴水路 | ||||
Yuezhou Avenue | 越州大道 | ||||
China Textile City | 中国轻纺城 | ||||
Mingzhu Square | 明珠广场 | ||||
Guazhuhu | 瓜渚湖 | ||||
Jingshui Road | 镜水路 | Yuecheng, Shaoxing | |||
Huangjiu Town | 黄酒小镇 | 1 (branch) | |||
Zhangshu | 张墅 | ||||
Olympic Sports Center | 奥体中心 | ||||
Meishan Square | 梅山广场 | 2 | |||
Fenglin | 凤林 | ||||
Datan | 大滩 | ||||
Railway Station | 火车站 | Shaoxing Urban | |||
City Square | 城市广场 | ||||
Lu Xun Native Place | 鲁迅故里 | ||||
Chengnan Avenue | 城南大道 | ||||
Fenghuangshan | 凤凰山 | ||||
Laojiafeng | 劳家葑 | ||||
Nanchi | 南池 | ||||
Qihu | 栖湖 | ||||
Fangquan | 芳泉 | ||||
- ^ Zhangshu station is under construction.
Branch line
- Remaining section opening in 2025.
Station Name | Connections | Distance km |
Location | ||
---|---|---|---|---|---|
English | Chinese | ||||
Huangjiu Town | 黄酒小镇 | 1 (main line) | Yuecheng | ||
Shaoxing No.1 High School | 绍兴一中 | ||||
Huxi | 湖西 | ||||
Daqingsi | 大庆寺 | ||||
Shaoxing North Railway Station | 绍兴北站 | ||||
Exhibition And Convention Center | 会展中心 | Keqiao | |||
Rolling stock
Stock | Class | Year built | Builder | Number built | Numbers | Formation | Depots | Line assigned | Notes |
---|---|---|---|---|---|---|---|---|---|
PM139 | B | 2020-2021 | CRRC Nanjing Puzhen | 108 (18 sets) | 01 001 - 01 019 (010011-010196) | Tc+Mp+M+M+Mp+Tc | Wanxiu Road Depot Jianhu Yard |
1 | |
ZBM02 | 2020-2022 | Beijing Subway Rolling Stock Equipment | 162 (27 sets) | 01 020 - 01 046 (010201-010466) |
References
- ^ a b c d e 绍兴正式进入“地铁时代” 两地“一张网”运营创全国先例. 新华网 (in Chinese). 2021-06-28. Archived from the original on 2021-06-28. Retrieved 2021-06-28.
- ^ a b c 地铁将开通,票价如何定?. 绍兴网 (in Chinese). 2021-06-04. Archived from the original on 2021-11-04. Retrieved 2021-06-15.
- ^ a b c d e 绍兴发布. "绍兴地铁,心心念念的好消息来了!".
- ^ a b 绍兴地铁1号线初步设计获批复!24个站分别位于这里. 浙江新闻 (in Chinese). 2018-10-11. Archived from the original on 2019-11-04. Retrieved 2019-11-04.
- ^ a b "绍兴地铁1号线支线(黄酒小镇站-大庆寺站)将于4月1日开通,出行信息这都有!".
- ^ "绍兴市城市轨道交通第二期建设规划环评公众意见征询". 2022-01-05. Archived from the original on 2022-05-02.
4号线一期:将现有1号线支线拆分为4号线,并在此基础上向南延伸
- ^ a b c d "Shaoxing Metro Line 1". Archived from the original on 2022-02-08.