Line 4 (Changsha Metro)

Line 4
Line 4 train ariving Guangda Station
Overview
StatusOperational
OwnerChangsha Government
LocaleChangsha, Hunan, China
Termini
Stations25
Service
TypeRapid transit
SystemChangsha Metro
Services1
Operator(s)Changsha Metro Corporation
Rolling stock6-car Type B
History
Opened26 May 2019; 5 years ago (2019-05-26)
Technical
Line length33.5 km (20.82 mi)
Number of tracks2
CharacterUnderground
Track gauge1,435 mm (4 ft 8+12 in)

Line 4 of the Changsha Metro (Chinese: 长沙地铁四号线; pinyin: Chǎngshā Dìtiě Sì Hào Xiàn) is a rapid transit line in Changsha. It began trial operations without passengers on 29 December 2018. The line opened on 26 May 2019 with 25 stations.

Opening timeline

Segment Commencement Length Station(s) Name
Guanziling — Dujiaping 26 May 2019 33.5 km (20.82 mi) 25 Phase 1

Stations (Phase 1)

Station name Connections Distance
km
Location
English Chinese
Guanziling 罐子岭
West Yueliangdao 月亮岛西
Xiangjiang New Town 湘江新城
Hanwangling Park 汉王陵公园
West Fuyuan Bridge 福元大桥西
Chazishan 茶子山
Guanshaling 观沙岭  CZT 
Liugoulong 六沟垅  6 
Wangyuehu 望月湖
Yingwanzhen 溁湾镇  2 
Hunan Normal University 湖南师大
Hunan University 湖南大学
Fubuhe 阜埠河  3 
Bishahu 碧沙湖
Huangtuling 黄土岭  1 
Shazitang 砂子塘
Chigangling 赤岗岭
Shumuling 树木岭  CZT 
Guitang 圭塘  5 
Shawan Park 沙湾公园  2 
Sutang 粟塘
Pingyang 平阳
South Railway Station 长沙火车南站  2   Maglev  CWQ
Guangda 光达  2 
Dujiaping 杜家坪

References

  1. ^ a b c d "长沙地铁4号线周日"迎客" 赶快带上这份乘车指南来"尝鲜"". 2019-05-25. Archived from the original on May 26, 2019.
  2. ^ "7项首创新技术!4号线今起空载试运行". 2018-12-29.